Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 

 

Bond Construction Sees Green

Field crews make great progress
Lucy Torres
Photographer
Light On• [Left] Long light poles lie on the ground waiting to be set up. With three light poles placed strategically on around the field, there will be enough lighting for night events. These lights will also protect the field from unwanted trespassers when unoccupied.

 

Dirt Off Your Shoulders• [Above] What now looks like a rough and muddy stretch of ground will soon become part of the outside athlete area. Constructors will attend to the mess before reaching their goal of perfection.

 

Saw The Sign• [Left] Due to the construction, signs were placed around the field only allowing sport practices during or after school to occur. Once construction on the new fields is complete, athletes and spectators will be able to occupy the brand new field for school sport games. Track will finally be able to host their own meets at Stratford.

 

Blast In The Bleachers• [Right] The new bleachers lie empty of seats and people to fill them with. They are a size upgrade from the old bleachers that seated far fewer fans. As soon as the bleachers are completed, the entire Spartan population will be able to sit comfortably and view the new field from great heights.